Trenchless LV Network Extension and Pillar Civil Works
#vector#directional-drilling

Trenchless LV Network Extension and Pillar Civil Works

Auckland | Vector Network Civil Works | Residential Connections

CIVILINK NZ

May 28, 2026

100 mm

PVC duct

~18 m

Drillshot

3-way

RDL pillar

2 x 60 A

New supplies

Trenchless LV Network Extension and Pillar Civil Works

Auckland | Vector Network Civil Works | Residential Connections

Civilink NZ delivered the civil infrastructure required to extend an existing low-voltage network to a new three-way residential distribution pillar. The project supported two new single-phase 60 amp electricity supplies and included approximately 18 metres of 100 mm PVC trenchless duct installation together with two dedicated pillar ducts.

The berm alignment was completed through a controlled drillshot, limiting the extent of open excavation. Civilink NZ also provided service locating, traffic management coordination, launch and receiving excavations, depth verification, warning protection, backfilling, reinstatement and final as-built documentation ahead of Vector's cable, pillar, service-pit and livening works.

Sanitised as-built: transformer-to-pillar drillshot and outgoing pillar ducts
Sanitised as-built: transformer-to-pillar drillshot and outgoing pillar ducts

Key Delivery Features

  • Approx. 18 m of 100 mm PVC trenchless duct installation
  • Civil preparation for a new three-way RDL pillar
  • Two 100 mm outgoing pillar ducts
  • Controlled excavation around existing live services
  • As-built documentation prepared for Vector handover

Project Outcome

The completed civil works established a compliant underground route between the existing transformer area and the new pillar position, enabling Vector to install the distribution cable, complete the service infrastructure and commission the new residential supplies.

On Site

Project Photos

Sanitised as-built: transformer-to-pillar drillshot and outgoing pillar ducts

Utility mark-out and drillshot alignment

Drillshot receiving excavation in the berm

Depth and cover verification beside an existing service

Duct termination at the controlled receiving excavation

Discuss a similar project

Talk to our team about your utility infrastructure civil works.

Get In Touch
Back to Projects